EXCHANGE Square Metrolink stop in Manchester reopened to trams during February, after almost a month of not being served.
Services have been suspended between Exchange Square and Victoria since January 17, following the discovery of a defect in a crossing, which was subsequently removed for offsite repairs.
Until reinstated, trams remained unable to run between the two stops, but East Didsbury-Shaw and Crompton services were diverted to run to Exchange Square instead at peak times from February 12, at 12 minute intervals.