■ THE extensive overhaul of Cleethorpes Coast Light Railway’s Fairbourne-built 2-6-2 No. 24, which went to John Fowler Engineering in Bouth, Cumbria, in January 2022, continues to progress. Work recently completed includes a boiler hydraulic test, fitting a new ashpan, shotblasting of the tender bogie frames, fitting new tender bogie wheelsets and bearings, and work on the cab and frame mountings.
■ THE Vale of Rheidol Railway is restoring carriage No. 16, which has never run in the preservation era. The underframe has been rebuilt and the body will replicate a 1920s VoR wooden-bodied compartment coach.
■ LEIGHTON Buzzard Railway has constructed a new welfare van for its permanent way team, which includes a partitioned Portaloo base unit. Based on an older vehicle which utilises a Motor Rail Simplex chassis, the van has been designated as ‘Motel’, i.e. Mobile Toilet Ex-Locomotive!
Leggete l'articolo completo e molti altri in questo numero di
Railway Magazine
Opzioni di acquisto di seguito
Se il problema è vostro,
Accesso per leggere subito l'articolo completo.
Singolo numero digitale
March 2024
 
Questo numero e altri numeri arretrati non sono inclusi in un nuovo
abbonamento. Gli abbonamenti comprendono l'ultimo numero regolare e i nuovi numeri pubblicati durante l'abbonamento. Railway Magazine
Abbonamento digitale annuale
€40,99
fatturati annualmente
Abbonamento digitale di 6 mesi
€21,99
fatturati due volte l'anno
Abbonamento digitale mensile
€4,99
fatturati mensilmente