Australian Railway History  |  ARH March 2018
Peter Cokley opens the March issue of Australian Railway History with Part 2 of his documentation of the Thomas Nationwide Transport (TNT) Salisbury Container Terminal. This outlines the changes that occurred there through to its closure in April 1996.
Frank Johnson concludes his account of his time as Divisional Engineer in the Narrabri Region of the NSW Railways by concluding the track restoration following the 1971 floods and documenting the railway accidents that occurred during his tenure. Frank also covers the mechanisation of track maintenance work at this time and the annual conferences of the Way and Works Branch in Sydney.
Rod Milne documents the extension of the Queensland Railways branch line from Allora to Goomburra opened in July 1912 and closed in December 1993.
Seguir leyendo
leer menos
omo abonado recibirá las siguientes ventajas:
• Un descuento sobre el PVP de su revista
• Su revista en su dispositivo cada mes
• Nunca te perderás un número
• Estás protegido de las subidas de precios que puedan producirse más adelante en el año
Recibirás 12 problemas durante un año Australian Railway History suscripción a la revista.
Nota: Las ediciones digitales no incluyen los artículos de portada ni los suplementos que encontraría en los ejemplares impresos.
Artículos de este número
A continuación encontrará una selección de artículos en Australian Railway History ARH March 2018.